![]() |
The oven chamber begins...
|
|
![]() |
A sticky mixture that allows the bricks to be leveled and replaced in the future if needed. | |
![]() |
The walls have been mocked up and the lintle checked for level. Pavers have been cemented in under the firebricks at the front to bring them up to the same level as the oven floor. A little wine always goes well after a hard days work. |