Village of Stirling
Building Plan
Utilities
Back to Municipal Page
- Any development requires a Development Permit from the Village.
- Following the acquisition of a Development Permit a Building Permit needs to be purchased.
- 2 sets of architectural designs, structural designs,
mechanical designs, and electrical drawings
- Permit filled out and fee paid
-Village will courior the permit to Alberta Permit Pro
for the final approval with a turn around time of
approximately 1 week.
- Following approval from Alberta Permit Pro a Building Permit is issued.
- A Building Permit is required for all construction in excess of $500.00.
- Plumbing and Electric Permits are also acquired from the Village Office.
Subdivisions
- All Subdivisions are now carried out through the Village Office.
- A detailed sketch of the proposed subdivision area needs to be supplied along with the applicable fee.
Utilities
| Maximum Water Flow | 4.782 cubic meters/ day |
| Maximum Sewer Flow | 120,000 gal/ day |
1996 Mill Rates
- Public Residential 34.62
- Separate Residential 33.79
- Public Farm, Vacation-Residential 62.03
- Separate Farm, Vacation-Residential 61.19
- Commercial 65.64
Top of Page
Back to Municipal Page
Click here to send e- mail
Copyright ©1997
Village of Stirling
All Rights Reserved.
last revised July 10, 1997
URL: http://www.telusplanet.net/public/vicstir/